Amtrak platform demolition
Demolition on the center platform along an active Amtrak and BNSF corridor. Certified payroll, rail safety training, cut-slab sections picked out with the Cat 304 and Bobcat T770, and the pad graded for the next phase.
M&M Concrete Inc. · Job log
Rail corridors, commercial demolition, ADU foundations and residential pours. Here is where our crews are working now and what we just wrapped up.
Where our crews are working this month.

Demolition on the center platform along an active Amtrak and BNSF corridor. Certified payroll, rail safety training, cut-slab sections picked out with the Cat 304 and Bobcat T770, and the pad graded for the next phase.

Breaking out and hauling off a commercial parking area with our Bobcat T770 and hydraulic breaker, then prepping the site for its new pour.

Footing and trench dig-outs with our mini excavators. Clean lines, compacted base, ready for inspection.

Graded and compacted the pad, trenched 138 LF of continuous footings, set the vapor barrier, rebar in the footings and wire mesh in the slab, then poured a smooth-finish structural slab with all pad footings and anchor bolts set. Framing-ready.

Full CMU generator enclosure at a live healthcare facility: 78 ft of fully grouted block wall, a 6-inch equipment slab plus an elevated pad, conduit trenching, asphalt patch-back and a new access gate.

Tore out and rebuilt 15,390 SF of asphalt parking with new curb, gutter and ADA-compliant approaches at a healthcare center, working around a facility that stayed open the whole time.

Demolished the old courtyard, turf and asphalt parking area at a behavioral health facility, graded and compacted concrete road base, then installed the new concrete, artificial turf, a basketball court and ADA truncated domes.

Excavated and poured the footing along a sloped side yard, then built a fully grouted CMU wall with a level top course, ready for veneer. A freestanding yard wall, not a retaining wall, so no drainage was needed.

Nothing torn out here: we cut the dirt down to the elevation of the new concrete, compacted the base, and poured a driveway extension with new concrete steps up to the entry, saw-cut to match the existing panels.












We keep a few openings each week for grading, demolition and concrete jobs. Most quotes go out within 24 hours of the walk-through.